Please read these terms and conditions carefully before using our services.
By accessing or using Stone Ridge Development’s services, you agree to be bound by these Terms of Service and acknowledge that you have read, understood, and agree to all terms and conditions herein. If you do not agree to these terms, please do not use our services.
These terms apply to all visitors, users, and others who access or use our services, including our website, phone consultations, estimates, and on-site concrete, excavation, and construction services in Tennessee.
Stone Ridge Development (“Stone Ridge,” “we,” “us,” or “Contractor”) provides professional concrete, excavation, and construction services including, but not limited to:
All services are provided in the Tri-Cities / East Tennessee area, surrounding counties, and other regions within our normal service area as determined by the contractor.
Seasonal & Weather Limitations:
Concrete, excavation, and construction operations are subject to seasonal and weather limitations including:
Work scheduled during marginal weather periods may be rescheduled or temporarily suspended at our discretion without penalty.
Free estimates are provided in good faith based on visual inspection and information available at the time of estimate. Final pricing may vary based on:
Estimates are valid for 30 days from the date issued. Any changes to pricing exceeding 10% of the original estimate will be communicated and approved in writing before we proceed.
Unless otherwise stated, estimates assume stable subgrade and typical site conditions. Additional charges may apply for:
Customer is responsible for disclosing any known subsurface conditions including previous utilities, buried debris, underground structures, or soil contamination.
IMPORTANT: CALCULATOR AND ESTIMATE LIMITATIONS
All calculators, estimators, and pricing tools on our website, including but not limited to cost calculators, material calculators, and project estimators, provide ESTIMATES ONLY and are for informational purposes.
These tools:
ACTUAL COSTS MAY VARY SIGNIFICANTLY from calculator estimates. For accurate pricing, you must obtain a formal written estimate after an on-site evaluation. Stone Ridge Development disclaims all liability for discrepancies between calculator estimates and actual costs.
PRICE MATCH TERMS AND CONDITIONS
While we strive to offer competitive pricing, any price match offers are subject to the following terms:
WE RESERVE THE RIGHT TO REFUSE ANY PRICE MATCH REQUEST AT OUR SOLE DISCRETION.
Price match approval is not guaranteed and is subject to verification of all terms and conditions. We may decline to match prices that we determine to be below our cost, unsustainable, or not comparable in quality, scope, or warranty coverage.
Payment terms will be clearly specified in your written estimate or contract.
We accept cash, check, and major credit cards. Financing options may be available for qualified customers.
Late payments are subject to a 1.5% monthly service charge (18% annual rate) and may result in lien filing. Customer is responsible for all collection costs and reasonable attorney fees if legal action becomes necessary.
IMPORTANT WARRANTY LIMITATION – READ CAREFULLY
Stone Ridge warrants its workmanship on concrete, excavation, and related construction services to be free from defects in installation for one (1) year from the completion date, limited to repair or replacement at our sole discretion.
This workmanship warranty applies to:
Work must have been performed in accordance with industry standards and the agreed scope.
THIS WARRANTY APPLIES ONLY TO WORKMANSHIP AND INSTALLATION – NOT TO MATERIALS.
WE DO NOT WARRANTY MATERIALS SUPPLIED BY OTHERS
Stone Ridge provides NO SEPARATE WARRANTY on materials, including but not limited to:
Any material warranties, if available, are provided directly by the manufacturer or supplier. The customer must pursue any material defect claims directly with those parties. Stone Ridge’s warranty covers only the labor and workmanship of installation, not the materials themselves.
Contractor disclaims all implied warranties, including merchantability and fitness for a particular purpose, regarding any materials used in construction.
Warranty specifically excludes, but is not limited to:
Warranty validity requires reasonable maintenance by the customer, including:
IMPORTANT LIABILITY LIMITATION
Stone Ridge’s total liability for any claim, whether in contract, tort, or otherwise, shall not exceed the total contract value paid by the customer. Stone Ridge shall not be liable for:
Stone Ridge is not liable for:
Material limitations: Stone Ridge disclaims liability for material defects, natural color variations, or supplier delivery delays. Concrete and other construction materials are manufactured to industry standards, but variations in color, finish, or appearance are normal and not grounds for warranty claims.
Customer is responsible for:
Customer acknowledges that:
Any changes to the original scope of work must be approved in writing with pricing specified before additional work begins.
Additional work required due to unforeseen conditions will be charged at prevailing rates, which may include:
Customer has the right to decline additional work; however, Stone Ridge may suspend work if conditions create safety concerns or prevent proper completion of the original scope.
Concrete, excavation, and construction work require specific weather and site conditions. Work may be delayed or suspended due to:
Stone Ridge is not liable for delays due to weather, acts of God, government actions, labor disputes, material shortages, or other circumstances beyond our reasonable control.
These terms are governed by the laws of the State of Tennessee. Any disputes shall be resolved in the courts of Washington County, Tennessee.
Customer agrees to attempt good-faith mediation before filing suit. In any legal proceeding, the prevailing party is entitled to reasonable attorney fees and costs.
If any provision of these Terms is deemed unenforceable, the remaining provisions shall remain in full force and effect.
Stone Ridge Development maintains comprehensive general liability insurance and workers’ compensation coverage and complies with applicable local, state, and federal regulations. Surety bonding may be available for projects requiring bonded contractors, as agreed in writing.
This contract is subject to Tennessee contractor lien laws (Tennessee Code Annotated Title 66, Chapter 11). Stone Ridge has the right to file a mechanic’s lien for unpaid work.
For qualifying contracts, the customer may have a right to cancel within three (3) business days under the Tennessee Consumer Protection Act or other applicable law. Where required, cancellation notices will be provided as part of the written contract.
All work will be performed in compliance with Tennessee 811 utility location requirements. Customer acknowledges that utility locating is required by Tennessee law and that Stone Ridge is not responsible for unmarked or incorrectly marked utilities.
These Terms may only be modified in a written document signed by both parties. These Terms, together with any written contract, proposal, or estimate issued by Stone Ridge, constitute the entire agreement between the parties and supersede all prior negotiations, representations, or agreements, whether written or oral.
No verbal promises or agreements not included in the written contract and these Terms are binding on Stone Ridge Development.